Add your photo here
Smart meter and electrical panel
Novion reads your building meter in real time and distributes available power across every charger β automatically. No grid upgrades. No manual limits. No blown fuses.
A smart meter or CT clamp reports your building consumption every 5 seconds. Novion supports Modbus TCP, Shelly Pro 3EM, generic HTTP JSON, and a built-in simulator for testing.
Available power = your contracted capacity minus current building load minus a 1 kW safety margin. The engine recalculates every cycle and distributes headroom equally across all online chargers.
Novion sends OCPP SetChargingProfile commands to each charger with updated power limits. If building load spikes, chargers throttle down within 5 seconds. When load drops, they ramp back up.
Without DLM, 10 chargers at 7.4 kW each need 74 kW of grid capacity β which means an expensive infrastructure upgrade. With Novion DLM, those same 10 chargers share whatever capacity is available, and every vehicle still charges on time.
Deploy chargers on your existing electrical infrastructure. DLM ensures you never exceed your contracted power β even at full occupancy.
No charger drops below 6A single-phase (1,400 W). Every vehicle continues charging, even when the building is at peak load.
Set a power budget per CPO site. The engine respects the limit regardless of how many chargers come online.
The CPO dashboard shows live grid load, headroom, and per-charger power allocation. The superadmin system page shows DLM sensors across all tenants with network-wide load balancing events. Every power adjustment is logged for compliance.
Deploy more chargers on your existing connection. Novion DLM handles the physics.